Build a PCB design around clear electrical requirements, realistic fabrication rules and a complete release package. Use this guide to connect the schematic, layout and manufacturing review.

DefineElectrical and mechanical intent
ReviewLayout, fabrication and assembly
ReleaseAn agreed manufacturing package
01 / The starting point

A good layout starts before the first trace.

Treat PCB design as a set of documented decisions—not a collection of default CAD settings.

Write down what the board must do, how it fits the enclosure and how it will be assembled and tested. Then translate those requirements into net classes, geometry constraints and drawing notes.

Minimum trace width and spacing are tied to the fabrication process, including copper thickness. Select the intended construction before adopting a supplier’s rule set.

No universal minimums. This guide does not establish GlobalWellPCB trace, drill or spacing capabilities. Confirm project-specific rules with the fabricator and use the applicable electrical and product requirements where they are stricter.
02 / Set the constraints

Define rules that describe the finished board.

Swipe horizontally to read the full table.

Design decisions to resolve before detailed routing
Design itemWhat to defineWhat to review
Copper width & spacingSeparate routing rules for power, signals, fine-pitch escapes and special net classes.Match the rule set to the intended copper construction; do not use the process minimum everywhere.
Holes & annular ringsFinished hole size, tolerance, plating status and pad geometry.Distinguish plated component holes, vias and non-plated holes. Do not confuse finished diameter with the drill tool.
Board edges & cutoutsCopper-to-profile rules, slot shape, plating and any intentional edge copper.Review routed edges and scored edges separately. Call out exceptions rather than letting CAM infer intent.
Solder maskPad openings, intended covered vias and narrow mask webs.Inspect the generated mask layers. Mask expansion is not the same as electrical clearance.
Component footprintsExact package variant, pad numbering, exposed pads and land pattern.Compare the footprint with the component manufacturer’s drawing, not just a matching package name.
Controlled netsSignal layer, reference planes, width/gap constraints and target impedance.Agree the stackup before locking geometry; check the return path at layer transitions.
Mechanical featuresA closed outline, dimensioned critical features and assembly keepouts.Supply unambiguous routing and slot information on the mechanical drawing.
03 / Place, then route

Review the board in functional groups.

01

Freeze mechanical anchors first

Start your placement review with the board boundary, connectors, mounting hardware and restricted volumes. Record which dimensions are fixed and which may change before optimizing component density.

02

Use device-specific placement guidance

Check the selected device’s reference layout and application notes for critical support components. Keep a record of deliberate departures so the reviewer knows which areas need closer attention.

03

Trace the complete current loop

For fast signals, keep the reference structure continuous. A short signal route that crosses a plane gap still needs attention; review the return connection when the signal changes layers.

04

Keep high-current decisions separate

Document load current, duty cycle, copper construction and the allowed temperature rise. Mark bottlenecks such as connector pins, neck-downs and vias for project-specific electrical and thermal analysis.

05

Reserve test and assembly access

Add test points, programming access and assembly clearances to the placement review. Ask the assembler which edges, surfaces and locations must remain accessible for the selected process.

06

Inspect generated output, not only CAD

Use a separate fabrication-data viewer to check layer assignment, outline, holes, mask and markings. A saved layout file and the exported production package should describe the same revision.

04 / Design handoff

Use four review gates, not one final inspection.

  1. 01

    Requirements review

    Approve the electrical brief, mechanical interfaces and a list of unresolved requirements. Assign an owner to each open question.

  2. 02

    Construction review

    Request a stackup and agreed fabrication rules. Flag fine-pitch areas or fixed geometry before completing the full route.

  3. 03

    Layout review

    Check connectivity, mechanical fit and design-rule results. Review documented exceptions rather than suppressing warnings without explanation.

  4. 04

    Release review

    Compare the final exports, drawing, BOM and assembly outputs. Record the exact revision approved for fabrication and assembly.

Keep the review scopes distinct. A CAD design-rule check checks configured rules; it cannot replace independent fabrication, assembly or functional verification.
05 / Release worksheet

Before you send the design for review.

Use this as a personal release check. A checkmark records your review, not manufacturer approval.

0 / 10 items checked

Works only in this browser tab. Refreshing clears the checkmarks. No design files or form data are uploaded.

Practical answers

Frequently asked questions

Check the design, files and manufacturing requirements before sending your next board for production.

What trace width and spacing should I use?

Use a construction-specific fabrication rule set and your electrical requirements. Thicker copper and other process choices can change the available geometry. Ask for review rather than assuming a number from another PCB is suitable.

Does passing DRC mean the PCB is ready to manufacture?

No. DRC checks the rules and connectivity conditions configured in the CAD project. A separate release review should address fabrication interpretation, assembly details and unresolved requirements.

Should I remove every warning?

Investigate every relevant warning. Correct genuine problems and document deliberate exceptions with a reason and an owner. A suppressed message is not evidence that the underlying design intent is correct.

When should I request a stackup?

Request it before fixing controlled-impedance widths and gaps. Model the transmission line using the intended dielectric, reference structure and finished copper geometry.

What should be included in the first review request?

Send the board revision, proposed construction, fabrication data and drawing, quantity, and the questions you need answered. Include assembly files when the review also covers placement, parts or testing.

Continue your design review

Use this guide to define your design constraints. For project delivery and engineering scope, see PCB design services; for placement and routing work, see PCB layout services.

Technical references & scope notes
  1. Würth Elektronik — BASIC Design Rules (PDF)
  2. Würth Elektronik WEdirekt — Design Guide for PCBs from the online shop (PDF)
  3. Würth Elektronik — Technical Delivery Specification for PCBs (PDF)
  4. KiCad — PCB Editor: Manufacturing Outputs and Design Rules
  5. Texas Instruments — High-Speed Layout Guidelines, SLLA414A
  6. KiCad 10 — PCB Editor manual
  7. Polar Instruments — Microstrip structures, AP122
  8. Polar Instruments — Modeling precision and fabrication geometry, AP170

References support general engineering guidance. Supplier-specific limits, example constructions and qualification results are not GlobalWellPCB capabilities. Use the approved project specification and confirmed manufacturing rules for each order. Content reviewed: September 2026.