PCB Assembly File Requirements

Make every part, position and process instruction traceable to one build.

Manufacturing handoffIllustrative package
CSVBOM_RevB_VariantA.csv
CSVPlacement_RevB.csv
PDFAssembly_Top_Bottom.pdf
TXTProgramming_and_Test_Scope.txt

One consistent file set, with a clear revision.
Include any questions for your project contact.

01
Define the releaseRevision & configuration
02
Check the dataGeometry & conventions
03
Prepare the handoffProject files and questions

Connect the board, the parts and the placement

Manufacturing geometry does not, by itself, establish purchasing intent or the complete assembly process.

A BOM identifies the parts to be assembled. A component placement list identifies where included component references are placed, their rotation and their board side. Both must correspond to the same product configuration.

Assembly preparation checklist — applicability depends on the agreed assembly and test scope
File / informationWhat it should establishConsistency check
Released PCB definitionFabrication dataset or approved bare-board revisionMake the supplied bare boards and assembly documents refer to the same PCB revision.
Purchasing BOMManufacturer, exact primary MPN, designators, per-board quantity and populate stateAdd approved alternatives and sourcing responsibility in separate fields.
Placement dataOne position per component included in the placement scopeDeclare origin, units, side, coordinate center and rotation conventions.
Assembly drawingsTop and bottom placement views, reference designators, pin 1 and polarityLabel the viewing direction; show nonstandard orientations and hand-fit details.
Paste / stencil inputsReleased paste apertures and special stencil instructions where relevantDo not substitute solder-mask openings for the paste layer.
Variant and exceptionsDNP list, hand-fit parts, through-hole parts and mechanical assembly itemsExplain any intentional BOM-to-placement mismatch.
Programming and testingApplicable firmware, programming instructions and test procedureDefine versions, interfaces, fixtures, pass/fail limits and expected reports.
Consigned materialsPacking list, MPNs, quantities, packaging and agreed extra materialSeparate board demand from setup/attrition allowance and pack quantities.

Review the package as one configuration

Reference designators are the connection between files—not an instruction to ignore process exceptions.

  1. 01

    Lock the PCB revision and assembly variant

    Put the configuration on the manifest, BOM, placement file and drawings. Where one PCB supports several variants, identify the selected population rather than merging incompatible builds.

  2. 02

    Reconcile references

    Check that every fitted component is accounted for in the appropriate assembly operation. Find duplicate references, missing parts and intentional DNP positions. Do not delete a mismatch until its cause is understood.

  3. 03

    Check polarity and orientation

    Review pin 1, diode direction, polarized capacitors, LEDs, connectors and modules against the released drawings and component data. An angle in a CSV is not sufficient evidence by itself.

  4. 04

    Close the exceptions

    Record hand assembly, press-fit, hardware, fiducials, test points and excluded positions. The placement list and purchasing BOM need not contain identical classes of objects.

  5. 05

    Approve the release

    Resolve open questions, permitted substitutions, process exceptions and test coverage. A valid file import is not the same as an approved build.

Document the steps that coordinates cannot describe

Hand assembly and mechanical work

Identify component stand-off, connector orientation, hardware, torque or fixture needs where they apply. Reference a controlled instruction rather than a note buried inside a filename.

Programming

Where programming is required, include the approved image, version, checksum, target configuration, interface and success criteria. Handle secrets and device credentials through an approved process, not public templates.

Test and inspection

Define the requested inspection and test scope, fixtures, procedures, limits and evidence. Do not assume that assembly inspection includes a project-specific functional test.

Coating and special processes

Identify areas that must be coated or masked, material requirements and acceptance criteria where relevant. Confirm process compatibility instead of using an ambiguous instruction such as “coat all.”

Separate sourcing decisions from placement data

A clear owner per BOM line prevents duplicate buying and missing material.

Turnkey

Identify the exact primary part and any approved alternatives. Record who can authorize a substitution. A distributor stock code can help sourcing but should not obscure the approved manufacturer part.

Consigned

Supply a packing list that matches the BOM and identify delivered quantities, packaging and handling needs. Agree any additional material for setup or loss rather than applying a fixed universal percentage.

Mixed supply

Assign a sourcing owner to each line. Resolve which components are customer-supplied, factory-sourced or intentionally not fitted before the order is released.

Download the preparation files

Download the checklists and templates below without signing in or submitting a form.

PCB & PCBA workbook

Eight sheets: instructions, BOM and placement inputs/examples, RFQ review and batch arithmetic.

XLSX · 19.5 KB
Download

Blank BOM template

Header-only UTF-8 CSV. Add released purchasing data; no demonstration parts included.

CSV · 0.1 KB
Download

Blank placement template

Numeric millimeter / degree fields. Complete the accompanying coordinate convention notes.

CSV · 0.1 KB
Download

Release & coordinate manifest

Identify the file revision, stackup and coordinate conventions, and list any details you need help confirming.

TXT · 2.8 KB
Download

Frequently asked questions

Can assembly start from Gerbers only?

Do not assume so. The team also needs the purchasing and population intent and appropriate assembly instructions. Integrated CAD-to-manufacturing data can contain useful assembly information, but verify its actual completeness and the receiver’s agreed workflow.

Must every BOM item appear in the SMT placement file?

No. Through-hole, hand-fit and mechanical items may be handled separately. Fiducials or test features may be present in positional data without being purchased parts. Document these exceptions rather than forcing a false one-to-one match.

Is the same BOM valid for all product variants?

Only when the selected population and substitutions are unambiguous. Prefer a released variant-specific BOM or a formally controlled variant structure accepted by the assembly team.

What is the difference between an assembly drawing and a placement file?

The drawing communicates visual and process intent. A placement export provides positional records; Altium’s output can include location, rotation and side in CSV or text. Use the two together.

Is a firmware file enough for programming?

No. State the target, version, programming method, configuration, success criteria and any controlled credentials. Mark programming not applicable when it is outside the requested scope.

Technical references & scope

  1. [6] Altium Designer — Preparing assembly data
  2. [10] KiCad — PCB Editor: Manufacturing Outputs and Design Rules
  3. [13] JLCPCB — BOM/CPL preparation and consistency checks

Use the checklists and templates on this page to prepare your manufacturing files. Confirm the required formats and approved design revision with your project contact before ordering; export steps may vary by CAD software.