GlobalWellPCBPCB & PCBA Manufacturing
GlobalWellPCB

Cable Assembly

Arrange cable assemblies with defined connectors, pin mapping, length and installation requirements. Send the cable drawing and BOM to review termination, strain relief, electrical checks and delivery.

01
Specify the connectionConnector MPNs & pin map
02
Control the constructionLength, cable & strain relief
03
Verify the assemblyMechanical & electrical checks
Working with GlobalWellPCB

Cable assemblies that connect correctly and fit your product

A finished cable is more than two matching connector housings. Wire or cable construction, pin orientation, length references and protection determine whether it can be installed and used as intended.

GlobalWellPCB reviews custom cable requirements alongside your PCB or product assembly. Provide a drawing that describes both electrical connections and the physical build so the quotation covers the delivered cable you need.

Unambiguous connector identity

Use complete MPNs for housings, contacts and mating interfaces.

Pin mapping shown from the right view

Define the reference face and cavity numbering.

Length based on installation datums

Specify where measurement starts and ends.

Testing fits the intended duty

Agree continuity and any further electrical or mechanical checks.

Choose the scope

Choose the work your order needs

Power and equipment cables

Specify conductor, connector and termination requirements for the intended current and installation. Include retention and strain-relief details.

Signal and control cables

Define the connection map, shielding and routing requirements for control or signal interfaces. Any performance test needs its own limits and procedure.

Product-specific interconnects

Discuss cable assemblies delivered with boards, harnesses or an enclosure build. Provide installed views and identification for each connection.

Your order from start to finish

How the project moves forward

  1. 01

    Send the cable drawing and BOM

    Include connector MPNs, wire data, pin map and quantity.

  2. 02

    Review termination and fit

    Resolve mating views, measurement datums, strain relief and labels.

  3. 03

    Approve the sample specification

    Confirm the released drawing and electrical acceptance procedure.

  4. 04

    Assemble and verify

    Build and check the cables before the agreed packaging and delivery.

Prepare your enquiry

What to send for a useful quotation

File or requirementDetails to include
Connector BOMSpecify housing, contact and mating connector part numbers.
Cable materialIdentify conductor, insulation, shielding and required construction.
Project quantityState build quantity, variant identity and required timing.
Installed viewDescribe routing, clearance and the interfaces at each end.
Cable construction drawingShow connector views, pin mapping, measured length, wire or cable type and strain relief.
Cable acceptance instructionsSpecify continuity, polarity, shielding, mechanical checks and any performance tests.

Include the quantity, current revision and required delivery date. If a decision is still open, identify it in your message so the review can address it.

Agree the acceptance

Know what will be checked and returned

Review areaWhat it coversWhat to specify
Connection identityCheck cavity and pin mapping to the drawing.Use a defined connector view and netlist.
Physical constructionReview length, terminations, strain relief and marking.Specify tolerances and inspection points.
Electrical requirementsContinuity checks confirm connections; other performance needs require separate tests.Provide test conditions and pass/fail limits.

State any unit or batch identification, packaging and inspection or test records you need with delivery. The quotation confirms the operations and evidence included.

Compare the complete order

What shapes your quotation

A useful quotation describes the complete deliverable and its supply responsibilities. Include these items in the review so you can compare like-for-like scope.

  • Connector and cable MPNs, quantities and termination types.
  • Length, shielding, protection, labels and assembly complexity.
  • Fixtures, sample approval, electrical tests and packaging.

The delivery plan follows file readiness, approved materials and the requested operations. Share your target date and any items already available to help review the schedule.

Answers before you order

Frequently asked questions

Is a sample enough to define a cable?

A sample can support the review, but an approved drawing and BOM should define connector identity, pin map and dimensions for repeat orders.

Which connector view should I use?

Show whether the drawing is the mating face or wire-entry face and include cavity numbering. This prevents an otherwise correct netlist being mirrored.

Can you include continuity testing?

Request it with the pin map, mating interface and acceptance instructions. Additional insulation, signal or load tests require separate conditions.

Can cables be supplied with box build?

Include them in the product BOM and installation drawings so manufacture, connection and final-unit checks are coordinated.

Start your project

Discuss your Cable Assembly requirements

Send the files, quantity and deliverable you need. Add your supply responsibilities, target date and any test or documentation requirements so the review covers the complete order.

Request a quotation
Scroll to Top