GlobalWellPCBPCB & PCBA Manufacturing
GlobalWellPCB

Conformal Coating

Discuss conformal coating for your PCB assembly with the operating environment, coating material and coverage map. Define protected areas, keep-outs, curing and acceptance requirements before application.

01
Define the exposureEnvironment & service conditions
02
Control the coverageMaterial, masking & application
03
Verify the finishCure, inspection & acceptance
Working with GlobalWellPCB

Protect the assembly areas your product needs protected

Conformal coating adds a thin protective layer to specified areas of an assembled board. Its selection depends on the environment, materials, electrical requirements and future access needed for connectors, adjustment or repair.

GlobalWellPCB reviews coating within the complete assembly route. Provide a coating map and the required material specification so coverage, masking, cleaning and inspection can be included in the quotation.

Coverage shown on the drawing

Reduce interpretation of protected areas and keep-outs.

Material chosen for the application

Use your environment and compatibility requirements as the basis.

Assembly operations coordinated

Plan testing and masking before the application step.

Acceptance defined up front

Specify cure, thickness, coverage and required records.

Choose the scope

Choose the work your order needs

Specified coating materials

Identify the approved product or performance requirements. Acrylic, polyurethane and silicone families have different application and service considerations that need a project-specific selection.

Selective coverage and masking

Show where coating belongs and where it must stay out. Connectors, contacts, sensors and test points need clear instructions.

Coating with assembly and test

Sequence programming, electrical checks, cleaning and coating around the product requirements. Define any operation that must happen before coverage limits access.

Your order from start to finish

How the project moves forward

  1. 01

    Provide the environment and coating map

    Include material, protected areas, keep-outs and acceptance needs.

  2. 02

    Review compatibility and sequence

    Discuss board cleanliness, masking, test access and curing requirements.

  3. 03

    Approve the application plan

    Confirm the released map and inspection criteria.

  4. 04

    Coat and release the assembly

    Apply the agreed process and check the required finish before packaging.

Prepare your enquiry

What to send for a useful quotation

File or requirementDetails to include
Assembly identificationBoard revision, quantity and populated views.
Operating environmentDescribe exposure and product requirements driving protection.
Material constraintsProvide approved coating or material compatibility requirements.
Installed accessIdentify connectors, adjustable parts and locations needed after coating.
Coating specification and mapName the material and show coverage, keep-outs, masking and thickness requirements.
Sequence and acceptance instructionsState cleaning compatibility, cure requirements, tests and requested inspection records.

Include the quantity, current revision and required delivery date. If a decision is still open, identify it in your message so the review can address it.

Agree the acceptance

Know what will be checked and returned

Review areaWhat it coversWhat to specify
Coverage and keep-outsInspect the coated areas against the approved map.Define connector, contact and sensor exclusions.
Cure and finishReview the specified material process and finish criteria.Provide thickness or other measurement requirements.
Electrical and service needsConsider insulation, test access and any required post-coating checks.Agree the relevant acceptance procedure.

State any unit or batch identification, packaging and inspection or test records you need with delivery. The quotation confirms the operations and evidence included.

Compare the complete order

What shapes your quotation

A useful quotation describes the complete deliverable and its supply responsibilities. Include these items in the review so you can compare like-for-like scope.

  • Coating material, board area and the required coverage.
  • Masking complexity, cleaning, curing and handling.
  • Inspection, measurement, test sequencing and requested records.

The delivery plan follows file readiness, approved materials and the requested operations. Share your target date and any items already available to help review the schedule.

Answers before you order

Frequently asked questions

Will coating make the board waterproof?

Coating is a defined protective process, not a complete enclosure rating. Provide the actual exposure and protection requirements for your product review.

Which material should I request?

Specify an approved product or the required environmental and electrical performance. Selection and compatibility are reviewed with the assembly materials and intended use.

Can connectors and test points remain uncoated?

Mark them as keep-outs on the coating map, including masking and edge requirements.

Should functional testing happen before coating?

Define your required sequence. Some tests or programming need access that coating may restrict; any post-coating verification should also be specified.

Start your project

Discuss your Conformal Coating requirements

Send the files, quantity and deliverable you need. Add your supply responsibilities, target date and any test or documentation requirements so the review covers the complete order.

Request a quotation
Scroll to Top