Consigned Component Guidelines

Send a kit that can be identified, counted and released for assembly without guessing. Agree the material handoff before shipping customer-supplied components.

A usable kit carries its history.
  1. Identity

    Exact MPN, BOM line and lot information

  2. Condition

    Packaging, handling and exposure records

  3. Quantity

    Build need, agreed allowances and returns

Engineering reference. Confirm dimensions, process capability and acceptance requirements for the actual project.Sources & scope
01 / Start with the requirement

A consigned kit is more than a box of parts.

Consigned components are supplied by the customer for use in an agreed assembly build. Full and partial consignment both need a clear split of sourcing responsibility, a receiving plan and a way to handle shortages or discrepancies.

Contact us before shipping customer-supplied components to confirm packaging, quantity allowances, inspection needs, schedule impact and how unused parts will be handled.

Full consignment
The customer supplies the agreed component set for the build.
Partial consignment
Customer and assembler each source explicitly assigned BOM lines.
Receiving release
Identity, quantity and condition are reviewed before material is made available for the build.
02 / Practical guidelines

What to resolve before release

Use these review prompts with the actual design, component documentation and agreed manufacturing process.

Map every package to the released BOM

Label parts with the exact manufacturer part number and the relevant project/BOM line. Retain original manufacturer labels when available. A supplier SKU or value alone may not identify the correct package or option.

Agree usable packaging before shipment

Confirm reel, cut-tape, tray or tube requirements and any leader or loading needs. Protect components against physical damage and mix-ups; do not assume loose components are automatically acceptable.

Preserve handling and exposure information

Keep applicable MSL, ESD and temperature information with the material. For moisture-sensitive devices, record package opening and exposure history. Repacking or resealing alone is not evidence that a device meets its handling requirements.

Plan quantities beyond the fitted BOM

Separate fitted build quantity from agreed setup and additional-material allowances. Review high-value, scarce and packaging-constrained parts individually instead of applying one unexplained overage to every line.

Quarantine differences instead of guessing

Identify shortages, damaged packaging, uncertain identities and label mismatches at receiving. Obtain a documented disposition before using suspect material or substituting another part.

Reconcile what remains after the build

Agree how unused reels, opened packs, rejected material and customer-owned parts will be counted, labeled, stored or returned. Keep the final accounting linked to the purchase order and assembly revision.

03 / Reference table

Packaging questions to resolve before dispatch

These are suggested checks, not a declaration that every packaging type is accepted for every job.

On a small screen, scroll the table horizontally to see every column.

Assembly requirements to check before requesting a quotation
Supply formatPrepareConfirm with the assembly team
ReelOriginal identity labels, protected tape and clear usable quantity.Reel compatibility, leader/trailer needs and treatment of partial reels.
Cut tapeProtected pockets, consistent orientation and identified strips.Minimum usable strip/loading requirements and setup allowances.
TrayCorrect tray orientation, secure stacking and visible part/lot identity.Tray suitability, handling restrictions and any temperature limitations.
TubeProtected ends, clear identity and controlled component orientation.Tube compatibility and any special feeding or transfer work.
Moisture-sensitive materialApplicable labels, exposure history and protective packaging.Receiving status and any approved conditioning before assembly.
Loose or unusual itemsIndividual identification and damage protection.Explicit acceptance and any manual handling or inspection work.

Keep the approved project requirements in control. Record uncertainties, agreed exceptions and the supporting evidence before the affected operation is released.

04 / A closer look

Separate the build need from the agreed allowance.

The planning calculator below uses a transparent convention: round up the fitted requirement plus a percentage allowance, then add a fixed setup quantity. Its defaults are illustrative—not GlobalWellPCB policy. Confirm the resulting quantity per BOM line, especially for expensive or difficult-to-replace devices.

Base requirement
Board quantity × fitted quantity per board, for the chosen variant.
Additional allowance
A percentage of the base requirement, rounded up together with that base.
Fixed setup quantity
A separately agreed quantity added after rounding; avoid double-counting allowances.

Consigned quantity planner

Illustrative inputs—not a factory allowance policy. Review one BOM line at a time.

211 componentsBase fitted requirement: 200 · Additional material: 11. Confirm per BOM line.
Quantity = round up [boards × parts per board × (1 + allowance ÷ 100)] + fixed setup quantity.

The allowance is additional material as a percentage of the fitted requirement, not a yield-loss formula. Confirm both allowances to avoid double-counting. Quantity fields require whole numbers; the percentage supports up to four decimal places.

05 / Suggested workflow

Move from open questions to controlled decisions.

These steps organize a project review. They do not replace your formal release or acceptance process.

  1. Agree

    Confirm responsibilities, packaging and allowances.

  2. Prepare

    Label, count and document material condition.

  3. Reconcile

    Resolve receiving discrepancies before use.

  4. Close

    Record consumption, remaining stock and disposition.

06 / Use the checklist

Record the review.
Keep the evidence.

12 checks for this topic. Record status and notes, then export a text copy for your project discussion. A completed checklist is not certification or production approval.

0 reviewed · 0 blocked · 0 not applicable · 12 not reviewed

Session only. Nothing is saved automatically or transmitted. Export before closing or reloading. “Reviewed” records evaluation—not a pass verdict. Explain blocked and not-applicable items in the notes.

Showing 12 of 12 checks. Export always includes all checks.

01 / Scope

Consigned and assembler-sourced BOM lines are identified.

Use the released fitted variant.

02 / Scope

Accepted packaging and special handling are agreed.

Confirm exceptions before shipping.

03 / Scope

Ownership and remaining-material disposition are documented.

Include storage or return instructions.

04 / Identity

Exact MPNs match the released BOM and labels.

Include manufacturer, package option and BOM line.

05 / Identity

Lot information and original labels are retained where available.

Avoid mixing material without traceability.

06 / Identity

Alternates and substitutions require approval.

Do not replace by value or appearance alone.

07 / Condition

ESD and physical protection match the component needs.

Protect terminals, pockets and fragile packages.

08 / Condition

MSL and exposure information accompanies applicable parts.

Record missing or uncertain history.

09 / Condition

Any conditioning work is explicitly approved.

Use device and packaging restrictions; no blanket bake recipe.

10 / Quantity

Fitted quantity and per-line allowances are reconciled.

Separate setup quantities from percentage overage.

11 / Quantity

Receiving discrepancies have an owner and disposition.

Keep suspect material out of the released kit.

12 / Quantity

Final unused and rejected quantities will be recorded.

Link the accounting to the project and BOM revision.

Export your checklist and resolve outstanding items with your engineering team before production. Confirm any changes through your normal approval process.

07 / Common questions

Practical answers
before release.

Use these answers to frame the discussion. The approved project requirements remain the authority for the build.

Can I send exactly the fitted BOM quantity?

Confirm this before shipping. Setup, feeding and other agreed material allowances may require more than the number fitted to finished boards. High-value or scarce parts should have a line-specific plan rather than an assumed percentage.

Can I send cut tape instead of reels?

Confirm tape format, loading needs and quantity allowances with us before preparing the component kit for your assembly.

Should all moisture-sensitive parts be baked?

No blanket bake instruction is appropriate. Evaluate the exact device, exposure history, packaging and applicable handling procedure. Temperature and time must not be guessed; some packaging and components have specific restrictions.

Does a sealed bag prove the parts are ready for reflow?

Not by itself. Identity, storage/exposure history and the applicable device requirements still need review. Record any uncertainty and agree how it will be resolved before the material is released.

What happens to unused customer-owned parts?

Agree this in the order: return, storage or another authorized disposition. Include how quantities, opened packaging, lot identity and any rejected material will be recorded. No default storage or return promise is made here.

Technical references & scope

  1. KiCad — PCB Editor: Manufacturing Outputs and Design Rules

    KiCad documentation for PCB manufacturing outputs, component positions and design rules.

  2. Texas Instruments — quality, reliability and packaging FAQs

    Device-specific MSL, storage and package-temperature information.

  3. Texas Instruments — SMT and packaging application notes

    Starting point for the application note appropriate to the actual package.

  4. MacroFab — Solving Procurement Challenges for Your PCB Assembly

    An example of why customer-supplied material needs an agreed receiving workflow.

Use these engineering references alongside your component documentation and the standards specified for your order. Share your completed checklist with us to confirm assembly, testing and material requirements.